347-851-0547asbestop.us{nospam}gmail.com

Need a professional asbestos removal intervention ?
About our company
Our company has been part of one and the same group since January 1, 2006, so for more than 15 years. Our company is made up of 3 entities, namely:

ASBESTOP, specialized in several activities (entity operating only in US Territory) :
  • The treatment of materials containing dangerous pollutants such as asbestos, lead, ceramic fiber, etc.
  • Work in places with difficult access (using ropes).
  • Cleaning work.

FRANCE ENVIRONNEMENT, specialized in several activities :

  • The treatment of materials containing dangerous pollutants such as asbestos, lead, ceramic fiber, etc.
  • Work in places with difficult access (on ropes).
  • Cleaning work.
  • Insulation work (RGE certification, recognized as protector of the environment).

AMIANTEXPRESS, specialized in the transportation of hazardous materials: :

  • Packaging.
  • Transportation.
  • Administrative tracking.
France Environnement
France Environnement
The founder of this group and his design office have over 25 years' experience. Indeed, upstream of their role as managers, they worked as a laborer, site manager, site supervisor, before establishing themselves as a company(ies).

Since then, we have been supporting our clients on all their projects, armed with our certifications and our (US) license (Department of Labor of New-York).

This commitment is given material form by:

  • tracking regulatory monitoring, which changes each year
  • then by regular training of our employees in order to maintain our level of requirement
  • not forgetting our material investments which consist of the best means of protection available in the world.

We also own our equipment, which is inspected and maintained periodically.
Preliminary visit
1DIVISION NO.1 : ASBESTOS REMOVAL WORK
Here are the details of our asbestos removal work, guaranteeing the quality and safety we confer on to all your projects :

  • Preliminary visit (starting point of any serious and comprehensive service).
  • 2. Technical and financial proposal.
  • 3. Receipt of the WO (Work Order).
  • 4. Drawing up of the Removal Plan (sent to prevention and inspection agencies, then to principals).
  • 5. Administrative procedures (occupational medicine, waste tracking forms).
  • 6. Sampling strategy (independent laboratory COFRAC).
  • 7. Delivery of equipment.
  • 8. Installation of the site facilities.
  • 9. Security of the site (signs, delimitation of the perimeter, surveillance).
  • 10. Installation of equipment.
  • 11. Containment (depending on dust levels).
  • 12. Testing of installations.
  • 13. Operator equipment.
  • 14. Humidification of ACM (asbestos-containing materials).
  • 15. Removal and packaging on completion.
  • 16. Putting in Big Bags / Pallets (closed containers).
  • 17. Analyses (throughout the duration of the work according to the strategy).
  • 18. Acceptance of work and clearance of installations.
2DIVISION NO.2 : WORK ON REMOVAL OF LEAD
Still ubiquitous in buildings due to its ban on use dating only from 2003, lead is highly toxic.

To overcome this heavy metal in the best conditions, ASBESTOP uses an innovative process combining cryogenics with sandblasting under the name “cryogommage”. We work on any type of surface (metal beams, industrial equipment, etc.), with the same precautions as for asbestos removal work.

Here are the details of our lead removal work, guaranteeing the quality and safety we confer on all your projects:

  • 1. Preliminary visit (starting point of any serious and comprehensive service).
  • 2. Technical and financial proposal.
  • 3. Receipt of the WO (Work Order).
  • 4. Drawing up the Operating Method (sent to prevention and inspection agencies, then to principals).
  • 5. Administrative procedures (occupational medicine, waste tracking forms).
  • 6. Sampling strategy (independent laboratory COFRAC).
  • 7. Delivery of equipment.
  • 8. Installation of the site facilities.
  • 9. Security of the site (signs, delimitation of the perimeter, surveillance).
  • 10. Installation of equipment.
  • 11. Containment (depending on dust levels).
  • 12. Testing of installations.
  • 13. Operator equipment.
  • 14. Humidification of LCM (Lead-containing materials).
  • 15. Removal and packaging on completion.
  • 16. Putting in Big Bags / Pallets (closed containers).
3DIVISION NO.3 : WORK REQUIRING ACCESS USING ROPES
ASBESTOP teams carry out all types of interventions, including work requiring access using ropes, allowing them to carry out work at a height that is difficult to access.

  • 1. Preliminary visit (starting point of any serious and comprehensive service).
  • 2. Technical and financial proposal.
  • 3. Receipt of the WO (Work Order).
  • 4. Delivery of equipment.
  • 5. Establishment of lifelines.
  • 6. Testing of installations and validation by the (independent) inspection agency.
  • 7. Security of the site (signs, delimitation of the perimeter, surveillance).
  • 8. Operator equipment.
  • 9. Work on removal and/or laying of rainwater pipes or other installations, etc.
  • 10. Acceptance of work and clearance of installations.
4DIVISION NO.4 : TRAVAUX DE CURAGE
Cleaning work is necessary before any demolition or rehabilitation of a building. ASBESTOP teams remove false ceilings, partitions, bulky walls, etc. The advantage of entrusting this work to our company is to having an entire depollution and cleaning project carried out by just one company. Here are the details of our cleaning work, guaranteeing the quality and safety we confer on all your projects :

  • 1. Preliminary visit (starting point of any serious and comprehensive service).
  • 2. Technical and financial proposal.
  • 3. Receipt of the WO (Work Order).
  • 4. Drawing up the Operating Method (sent to prevention and inspection agencies, then to principals).
  • 5. Administrative procedures (occupational medicine, waste tracking forms).
  • 6. Delivery of equipment.
  • 7. Installation of the site facilities.
  • 8. Security of the site (signs, delimitation of the perimeter, surveillance).
  • 9. Removal and packaging on completion.
  • 10. Using skip containers.
  • 11. Acceptance of work and clearance of installations.
5DIVISION NO.5 : TRANSPORTATION
To carry out all of its activities, ASBESTOP has significant material resources, in particular for the transportation of Asbestos-Containing Materials (ACM) and Lead-Containing Materials (LCM).

And, for an optimal service, here is the procedure that we have put in place:

  • 1. Financial proposal.
  • 2. Receipt of the WO (Work Order).
  • 3. Provision of tracking slips.
  • 4. Loading operation(s).
  • 5. Transportation.
  • 6. Removal to the treatment site 1, 2, 3 (Inertam).
  • 7. Delivery of treatment forms.
6DIVISION NO.6 : INSULATION WORK
In order to better meet the expectations of our customers in terms of environmental protection, comfort and energy saving, ASBESTOP has developed a building insulation offer, focusing on performance: ETI (external thermal insulation) and joinery with high insulating properties.

We therefore have RGE certification and only use materials certified ACERMI, ACOTHERM and bearing the NF mark.

The RGE label
The RGE quality signs meet a set of requirements for resources and skills defined in standards NF X50-091 and NF EN ISO / CEI 17065. This label guarantees the company's expertise in terms of insulation solutions, as well as the technical quality of the installation of the insulation. It also ensures that the customer can benefit from the principle of eco-conditionality, and thus be able to apply for grants for the energy renovation of their building.

ACERMI CERTIFICATION
We have chosen insulation with ACERMI certification (Association for the Certification of Insulating Materials) to ensure that the insulation products have the characteristics presented on their label.

ACOTHERM CERTIFICATION
This label concerns glazing and joinery (windows, patio doors). It certifies their good performance in terms of thermal and acoustic insulation, but also durability.

THE NF MARK
The NF mark is also important among all the labels and certifications relating to insulation. It indicates in particular that the products comply with national, European and international standard documents.
OUR INSULATION SERVICES
  • 1. Preliminary visit (starting point of any serious and comprehensive service).
  • 2. Technical and financial proposal.
  • 3. Receipt of the WO (Work Order).
  • 4. Drawing up of the Removal Plan (sent to prevention and inspection agencies, then to principals).
  • 5. Delivery of equipment.
  • 6. Installation of the site facilities.
  • 7. Security of the site (signs, delimitation of the perimeter, surveillance).
  • 8. Installation of materials.
  • 9. Acceptance of work and clearance of installations.